Documents
Copies of all the documents and information relating to East Pye Solar can be found here.
Key DCO documents
The DCO application includes an extensive series of documents, such as a Draft Development Consent Order describing the powers being sought, the Environmental Statement assessing the potential effects and proposed mitigation measures associated with the Scheme, and a Consultation Report describing the phases of consultation undertaken and how feedback has influenced our proposals.
We have produced a Guide to the Application (which can also be found via the Planning Inspectorate Webpage for the Scheme).
The Examination Library contains all application documents, comments and evidence that has been submitted to the Planning Inspectorate so far. It will be updated regularly throughout the Pre-Examination and Examination process.
All DCO application documents can be found on the Planning Inspectorate webpage for East Pye Solar here.
The Application documents are available for electronic inspection via computer, free of charge, at the following locations and times set out below:
Long Stratton Library, The Street, Long Stratton, NR15 2XJ. Open Monday 11am to 7pm (staffed), Tuesday 1pm - 7pm (staffed), Wednesday 8am to 7pm (unstaffed), Thursday 1pm to 7pm (staffed), Friday 8am to 7pm (unstaffed) Saturday 11am to 4pm (staffed) and Sunday 10am to 4pm (unstaffed)
Loddon Library, 31 Church Plain, Loddon, NR14 6EX. Open Monday 10am to 7pm (staffed), Tuesday and Wednesday 8am to 7pm (unstaffed), Thursday and Friday 10am to 7pm (staffed), Saturday 1pm to 4pm (staffed) and Sunday 10am to 4pm (unstaffed)
Poringland Library, Overtons Way, Poringland, Norwich, NR14 7WB. Open Monday 2pm to 7pm (staffed), Tuesday and Wednesday 10am to 7pm (staffed), Thursday 8am to 7pm (unstaffed), Friday 2pm to 7pm (staffed), Saturday 10am to 4pm (staffed) and Sunday 10am to 4pm (unstaffed)
Bungay Community Library, Wharton Street, Bungay, NR35 1EL. Open Monday 9am to 14:30 and Tuesday to Saturday 9am to 5pm. Closed on Sunday.
An electronic copy of the application documents can be supplied free of charge on a USB memory stick. To request a USB, please email info@eastpyesolar.co.uk, write to FREEPOST East Pye Solar (free of charge; you do not need a stamp) or call 0808 281 3175 (free of charge).
Pre-Examination Materials
East Pye Solar Section 56 Notice - April 2026
East Pye Solar Pre-Examination Information Poster - April 2026
East Pye Solar Pre-Examination Newsletter - April 2026
East Pye Solar Concept Masterplan Overview - April 2026
East Pye Solar Concept Masterplan Section Maps A - E - April 2026
Community Updates
East Pye Solar Scheme Update Newsletter - January 2026
Targeted Consultation Information
East Pye Solar Targeted Consultation Information Change Note – October 2025
East Pye Solar Targeted Consultation Feedback Form – October 2025
East Pye Solar Targeted Consultation Information Poster – October 2025
Targeted Consultation Maps and Plans
East Pye Solar – Changes in the Vicinity of Site 1, National Grid Substation Site and Site 7D – October 2025
East Pye Solar – Localised Changes to Site Boundary Area – October 2025
East Pye Solar – Proposed Abnormal Indivisible Loads Routes – October 2025
East Pye Solar – Proposed HGV Routes – October 2025
Phase Two Consultation Information
Phase Two Consultation Community Consultation Postcard- June 2025
Phase Two Consultation Information Leaflet- June 2025
Phase Two Consultation Feedback Form- June 2025
Phase Two Consultation Indicative Masterplan (PEIR Figure 5.1) - June 2025
Phase Two Consultation Poster- June 2025
East Pye Solar BESS Fact Sheet- June 2025
Phase Two Consultation Event Display Boards- June 2025
Concept Masterplan Overview - June 2025
Concept Masterplan Section Map A - June 2025
Concept Masterplan Section Map B - June 2025
Concept Masterplan Section Map C - June 2025
Concept Masterplan Section Map D - June 2025
Concept Masterplan Section Map E- June 2025
Phase Two Webinar Presentation - July 2025
Phase Two Community Webinar Recording - July 2025
Phase Two Consultation Maps and Plans
PEIR Figure 1.1 Site Location Plan - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 1 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 2 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 3 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 4 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 5 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 6 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 7 - June 2025
PEIR Figure 5.1 Indicative Masterplan Sheet 8 - June 2025
PEIR Figure 5.2 Indicative Location of Construction Compounds- June 2025
PEIR Figure 11.2 Likely and Suitable Routes to the Scheme: Overview - June 2025
Preliminary Environmental Information Report (PEIR)
Statement of Community Consultation
East Pye Solar Statement of Community Consultation - June 2025
East Pye Solar S47 Notice - June 2025
East Pye Solar S48 Notice - June 2025
Post-Phase One Consultation Materials
Phase One Consultation Summary Report - March 2025
EIA Scoping Report Materials
East Pye Solar Scoping Report - January 2025
East Pye Solar Scoping Report - Figures Part 1 - January 2025
East Pye Solar Scoping Report - Figures Part 2 - January 2025
East Pye Solar Scoping Report - Figures Part 3 - January 2025
East Pye Solar Scoping Report - Appendix 5.1 - January 2025
East Pye Solar Scoping Report - Appendix 5.2 (1 of 3)- January 2025
East Pye Solar Scoping Report - Appendix 5.2 (2 of 3) - January 2025
East Pye Solar Scoping Report - Appendix 5.2 (3 of 3) - January 2025
East Pye Solar Scoping Report - Appendix 7.11 - 11.1 - January 2025
East Pye Solar - Scoping Report Site Location Plan: Overview - January 2025
The EIA Scoping Report Materials can also be accessed via the Planning Inspectorate page for East Pye Solar.
General Scheme Information
Project launch postcard - September 2024
Solar Project Search Area - September 2024
East Pye Solar Updated DCO Programme Document – October 2024
Phase One Consultation Information
Phase One Consultation Postcard - October 2024
Phase One Consultation Information Leaflet- October 2024
Phase One Consultation Feedback Form- October 2024
Phase One Consultation Poster - October 2024
Phase One Consultation Exhibition Boards - October 2024
Phase One Consultation Overview Map Indicative Concept Plan - October 2024
Phase One Consultation Section Maps 1 to 4 - October 2024
Phase One Consultation Section Maps 5 to 8 - October 2024
Phase One Consultation Section Maps 9 and 10 - October 2024
Phase One Consultation BESS, POC and National Grid Substation Development Area - October 2024
Phase One Consultation Indicative Masterplan - October 2024
Phase One Consultation Webinar Presentation - November 2024
If you would like a document in large text or an alternative format, please contact us on:
Tel: 0808 281 3175
Email: info@eastpyesolar.co.uk
Post: Freepost EAST PYE SOLAR